Gestion de projet et d'ingénierie
Survey and design, quantity surveying, tender documentation, permitting and site management — before and throughout construction.
What we do
Feasibility and preliminary studies, architectural/structural/MEP design coordination, item-based quantity surveying, tender documentation and technical specifications, permitting, programme development, site management and payment certificate control.
How we work
Project cost is decided at the desk, not on site. Quantities are produced item by item and exclusions are defined in writing — missing definitions are the usual source of later variation disputes. During construction, progress is measured against the programme and reported regularly.
Standards
Contract administration can follow FIDIC practice; measurement and payment control follow the authority's unit price and specification system.
Design and quantity surveying software, programming tools, site survey equipment (total station, GPS), photographic progress reporting.
Site management establishes a safety plan, subcontractor supervision and a daily permit-to-work system; safety performance forms part of the progress report.
Préqualification et enquête
Nous examinons les documents d'appel d'offres, visitons le site et documentons la situation actuelle ainsi que les attentes du client.
Métré et proposition
Nous fournissons une proposition clairement définie avec des métrés par poste ; les exclusions sont clairement indiquées.
Planification et permis
Un calendrier de travail unique, un plan de ressources et les processus de permis nécessaires sont établis.
Fabrication
Le chantier est établi, l'infrastructure et la superstructure sont exécutées selon un calendrier unique et rapportées régulièrement.
Livraison
La liste des défauts est clôturée, les documents as-built sont remis.
Gestion de projet et d'ingénierie
Can we engage you for project management only?
Yes. We can provide survey, measurement, tender documentation and site supervision separately, even where another contractor builds the works.
How long does permitting take?
It varies by authority and project type; an estimate is given only after reviewing local legislation and the file. The indicative schedule is shared in writing.

Planifions ensemble votre prochain projet
Partagez le périmètre de votre projet — notre équipe évaluera le site et préparera une offre détaillée.
Demandez une offre pour votre projet
Remplissez le formulaire et notre équipe d'ingénierie vous répondra avec une évaluation adaptée.