Travaux de terrassement et sol
Excavation, embankment, retaining structures and ground improvement — preparing the ground the works will sit on.
What we do
Excavation and haulage, controlled fill, slope stabilisation, retaining walls and reinforced earth structures, drainage, and ground improvement (lime/cement stabilisation, stone columns, jet grouting and similar methods).
How we work
No improvement method is selected without a ground investigation. The cut-fill balance is established and suitable material is separated. Layer thickness and compaction energy are set by a trial embankment; each layer is accepted by a compaction test.
Standards
Compaction is verified against Proctor testing; slope stability calculations and soil parameters are taken from the geotechnical report.
Excavators, dozers, graders, vibratory and sheepsfoot rollers, stabilisation mixers and a site laboratory. Haul routes and spoil tipping permits form part of the works.
Slope angles and shoring calculations are mandatory in deep excavation; groundwater ingress is addressed by drainage first. Site vehicle routes are separated from pedestrian ways.
Préqualification et enquête
Nous examinons les documents d'appel d'offres, visitons le site et documentons la situation actuelle ainsi que les attentes du client.
Métré et proposition
Nous fournissons une proposition clairement définie avec des métrés par poste ; les exclusions sont clairement indiquées.
Planification et permis
Un calendrier de travail unique, un plan de ressources et les processus de permis nécessaires sont établis.
Fabrication
Le site est établi, et l'infrastructure ainsi que la superstructure sont exécutées selon un calendrier unique et rapportées régulièrement.
Livraison
La liste des défauts est clôturée, les documents as-built sont remis.
Is ground improvement needed on every project?
No. If the investigation shows adequate bearing capacity, no improvement is carried out; unnecessary treatment inflates cost. The decision rests on the geotechnical report.
What happens to surplus excavated material?
Suitable material is reused as fill; the remainder is hauled to a licensed tipping site with records kept.

Planifions ensemble votre prochain projet
Partagez le périmètre de votre projet — notre équipe évaluera le site et préparera une offre détaillée.
Demandez une offre pour votre projet
Remplissez le formulaire et notre équipe d'ingénierie vous répondra avec une évaluation adaptée.