
Programmes de logement d'État
Turnkey delivery of mass housing and public building programmes together with their infrastructure.
What we do
Structural and finishing works for housing blocks and public buildings; internal roads, parking, water and sewerage networks, electrical and lighting infrastructure, landscaping and external works.
How we work
Repetition defines mass programmes: the first block is treated as a prototype where details and durations are settled, and subsequent blocks follow that pattern in series. Because infrastructure and buildings advance on one programme, no missing utility connection appears at handover.
Standards
Seismic design follows the applicable code and concrete and reinforcement works follow EN standards; the handover file includes as-built drawings and warranty documents.
Tunnel or system formwork, tower cranes, concrete pumps, precast element supply. On repetitive blocks the formwork cycle is the main programme variable.
Lifting operations and work at height dominate multi-block sites; crane operating envelopes are planned not to overlap. Striking times are tied to concrete strength results.
Préqualification et enquête
Nous examinons les documents d'appel d'offres, visitons le site et documentons la situation actuelle ainsi que les attentes du client.
Métré et proposition
Nous fournissons une proposition clairement définie avec des métrés par poste ; les exclusions sont clairement indiquées.
Planification et permis
Un calendrier de travail unique, un plan de ressources et les processus de permis nécessaires sont établis.
Fabrication
Le site est établi, et l'infrastructure ainsi que la superstructure sont exécutées selon un calendrier unique et rapportées régulièrement.
Livraison
La liste des défauts est clôturée, les documents as-built sont remis.
Programmes de logement d'État
Construction, maintenance and repair of religious and sports facilities in Mustafakemalpaşa, Karacabey and Mudanya
Construction, maintenance and repair of municipal service buildings, social facilities and village halls
Nilüfer Gümüştepe residential construction
Do you also build the infrastructure?
Yes — that is why the consortium exists. Internal roads, networks and external works run under the same contract as the housing.
Who tracks defects after handover?
The snag list is closed at handover; defects are tracked in writing throughout the warranty period.

Planifions ensemble votre prochain projet
Partagez le périmètre de votre projet — notre équipe évaluera le site et préparera une offre détaillée.
Demandez une offre pour votre projet
Remplissez le formulaire et notre équipe d'ingénierie vous répondra avec une évaluation adaptée.