
Infrastructure publique
Potable water, sewerage, stormwater and utility networks — executed to minimise disruption in the urban fabric.
What we do
Potable water transmission and distribution mains, foul sewers, stormwater drainage, pumping stations, valve and inspection chambers, network renewal and connection to existing systems.
How we work
In urban areas the critical step is locating existing services: a utility survey is carried out before excavation and crossings are confirmed in writing with the relevant authorities. Trench safety is provided by shoring, backfill and compaction are checked layer by layer, and the surface is reinstated.
Standards
Pipe materials and joints are selected to EN standards; pressure and tightness testing is a precondition of line acceptance.
Excavators, trench shoring systems, pipe laying equipment, welding machines (HDPE butt fusion), pressure test units and CCTV line inspection.
Trench collapse and strikes on existing services are the two main risks; shoring and pre-excavation location are mandatory. Temporary pedestrian and vehicle crossings are provided.
Préqualification et enquête
Nous examinons les documents d'appel d'offres, visitons le site et documentons la situation actuelle ainsi que les attentes du client.
Métré et proposition
Nous fournissons une proposition clairement définie avec des métrés par poste ; les exclusions sont clairement indiquées.
Planification et permis
Un calendrier de travail unique, un plan de ressources et les processus de permis nécessaires sont établis.
Fabrication
Le site est établi, et l'infrastructure ainsi que la superstructure sont exécutées selon un calendrier unique et rapportées régulièrement.
Livraison
La liste des défauts est clôturée, les documents as-built sont remis.
Infrastructure publique
İnegöl Solid Waste Landfill Area, 2nd Lot completion works
Construction of the Wholesalers' Produce Market
Infrastructure construction in various neighbourhoods of İnegöl district
Natural gas pipeline corrosion repair and insulation renewal
Can you renew a line without a water outage?
In most cases yes. Renewal is carried out with a bypass line; unavoidable outages are planned with the authority and announced to users in advance.
Who reinstates the damaged surface?
It is within our scope. Asphalt or block paving is reinstated to the section defined in the authority's specification.

Planifions ensemble votre prochain projet
Partagez le périmètre de votre projet — notre équipe évaluera le site et préparera une offre détaillée.
Demandez une offre pour votre projet
Remplissez le formulaire et notre équipe d'ingénierie vous répondra avec une évaluation adaptée.