Travaux de finition
Services

Travaux de finition

Walls, plaster, floor coverings, painting and all finishing works — the surface where the building meets its user.

Appelez-nous

What we do

Partition walls (masonry or plasterboard), plaster and screed, ceramic and natural stone, timber and laminate flooring, suspended ceilings, painting and decorative finishes, door and joinery installation, sanitary fittings.

How we work

Finishing quality is decided in preparation: no covering is applied before surface flatness, moisture levels and services close-out are checked. A sample room is produced and, once the client approves it, serial work begins — so colour and texture deviations do not become a later dispute.

Standards

Surface tolerances and adhesive/grout materials are selected in line with manufacturer technical data and EN standards.

Méthodes et équipements

Screed pumps, laser levels, moisture meters, drywall installation equipment and spray painting systems. A sample room is a standard step on every project.

Qualité et sécurité (HSE)

Solvent and dust exposure dominate in enclosed spaces; ventilation and personal protective equipment use are supervised. Material safety data sheets are kept on site.

Gestion de processus
01

Préqualification et enquête

Nous examinons les documents d'appel d'offres, visitons le site et documentons la situation actuelle ainsi que les attentes du client.

02

Métré et proposition

Nous fournissons une proposition clairement définie avec des métrés par poste ; les exclusions sont clairement indiquées.

03

Planification et permis

Un calendrier de travail unique, un plan de ressources et les processus de permis nécessaires sont établis.

04

Fabrication

Le site est établi, et l'infrastructure ainsi que la superstructure sont exécutées selon un calendrier unique et rapportées régulièrement.

05

Livraison

La liste des défauts est clôturée, les documents as-built sont remis.

Questions courantes
Who selects the materials?

The client decides; we assess technical suitability and buildability and offer alternatives. The approved sample becomes the reference.

Who is responsible for cracks and touch-ups after handover?

Defects arising from workmanship are covered by warranty. Damage from structural movement or use is assessed separately.

Travaux de finition

Planifions ensemble votre prochain projet

Partagez le périmètre de votre projet — notre équipe évaluera le site et préparera une offre détaillée.

Demandez une offre pour votre projet

Remplissez le formulaire et notre équipe d'ingénierie vous répondra avec une évaluation adaptée.

Aucun fichier sélectionné

Plan de masse, titre, image ou PDF

Partager cette page
Appeler