Entretien, Réparation et Renforcement
Repair, renewal and strengthening of existing road, bridge, infrastructure and building assets — extending life without rebuilding.
What we do
Road surface renewal and patching, bridge bearing and joint replacement, concrete repair (corrosion, carbonation), structural strengthening (jacketing, carbon fibre, added shear walls), utility line renewal, waterproofing and corrosion protection.
How we work
Diagnosis comes first in repair work: a repair carried out without finding the cause recurs quickly. Condition assessment is made, with coring and non-destructive testing where required, and the repair method follows those findings. Where the asset stays in use, work is phased.
Standards
Concrete repair materials are selected to the EN 1504 product family; strengthening calculations rest on a load capacity assessment of the existing structure.
Coring rigs, non-destructive testing equipment (rebar scanners, ultrasound), hydro-demolition and surface preparation equipment, shotcrete, carbon fibre application systems.
Working in an occupied asset puts user safety first: the work area is physically separated and dust and noise are controlled. Temporary propping requires structural approval.
Préqualification et enquête
Nous examinons les documents d'appel d'offres, visitons le site et documentons la situation actuelle ainsi que les attentes du client.
Métré et proposition
Nous fournissons une proposition clairement définie avec des métrés par poste ; les exclusions sont clairement indiquées.
Planification et permis
Un calendrier de travail unique, un plan de ressources et les processus de permis nécessaires sont établis.
Fabrication
Le site est établi, et l'infrastructure ainsi que la superstructure sont exécutées selon un calendrier unique et rapportées régulièrement.
Livraison
La liste des défauts est clôturée, les documents as-built sont remis.
Is strengthening or rebuilding more economical?
No answer is possible without a capacity assessment. Where the structural skeleton is sound, strengthening is usually faster and cheaper; we present the assessment in writing.
Can work proceed while the building is in use?
In most cases yes. A phased plan is set up and noisy operations are moved outside occupied hours.

Planifions ensemble votre prochain projet
Partagez le périmètre de votre projet — notre équipe évaluera le site et préparera une offre détaillée.
Demandez une offre pour votre projet
Remplissez le formulaire et notre équipe d'ingénierie vous répondra avec une évaluation adaptée.