Survey and design, quantity surveying, tender documentation, permitting and site management — before and throughout construction.

Call Us

What we do

Feasibility and preliminary studies, architectural/structural/MEP design coordination, item-based quantity surveying, tender documentation and technical specifications, permitting, programme development, site management and payment certificate control.

How we work

Project cost is decided at the desk, not on site. Quantities are produced item by item and exclusions are defined in writing — missing definitions are the usual source of later variation disputes. During construction, progress is measured against the programme and reported regularly.

Standards

Contract administration can follow FIDIC practice; measurement and payment control follow the authority's unit price and specification system.

Methods & Equipment

Design and quantity surveying software, programming tools, site survey equipment (total station, GPS), photographic progress reporting.

Quality & Safety (HSE)

Site management establishes a safety plan, subcontractor supervision and a daily permit-to-work system; safety performance forms part of the progress report.

Process Management
01

Prequalification & survey

We review the tender documents, visit the site and put the existing conditions and the client's expectations in writing.

02

Quantities & proposal

We produce item-based quantities and present a proposal with a clearly defined scope; exclusions are stated explicitly.

03

Planning & permits

A single programme, the resource plan and required permit processes are set up.

04

Execution

The site is mobilized; infrastructure and buildings proceed on one schedule and are reported regularly.

05

Handover

The snag list is closed and as-built documents are handed over.

Common Questions
Can we engage you for project management only?

Yes. We can provide survey, measurement, tender documentation and site supervision separately, even where another contractor builds the works.

How long does permitting take?

It varies by authority and project type; an estimate is given only after reviewing local legislation and the file. The indicative schedule is shared in writing.

Project & Engineering Management

Let's Plan Your Next Project Together

Share your project scope — our team will assess the site and prepare an item-based proposal.

Request a proposal for your project

Fill in the form and our engineering team will get back to you with an assessment tailored to your scope.

No file selected

Site plan, deed, image or PDF

Share this page
Call