Public Infrastructure
Potable water, sewerage, stormwater and utility networks — executed to minimise disruption in the urban fabric.
What we do
Potable water transmission and distribution mains, foul sewers, stormwater drainage, pumping stations, valve and inspection chambers, network renewal and connection to existing systems.
How we work
In urban areas the critical step is locating existing services: a utility survey is carried out before excavation and crossings are confirmed in writing with the relevant authorities. Trench safety is provided by shoring, backfill and compaction are checked layer by layer, and the surface is reinstated.
Standards
Pipe materials and joints are selected to EN standards; pressure and tightness testing is a precondition of line acceptance.
Excavators, trench shoring systems, pipe laying equipment, welding machines (HDPE butt fusion), pressure test units and CCTV line inspection.
Trench collapse and strikes on existing services are the two main risks; shoring and pre-excavation location are mandatory. Temporary pedestrian and vehicle crossings are provided.
Prequalification & survey
We review the tender documents, visit the site and put the existing conditions and the client's expectations in writing.
Quantities & proposal
We produce item-based quantities and present a proposal with a clearly defined scope; exclusions are stated explicitly.
Planning & permits
A single programme, the resource plan and required permit processes are set up.
Execution
The site is mobilized; infrastructure and buildings proceed on one schedule and are reported regularly.
Handover
The snag list is closed and as-built documents are handed over.
Public Infrastructure
İnegöl Solid Waste Landfill Area, 2nd Lot completion works
Construction of the Wholesalers' Produce Market
Infrastructure construction in various neighbourhoods of İnegöl district
Natural gas pipeline corrosion repair and insulation renewal
Can you renew a line without a water outage?
In most cases yes. Renewal is carried out with a bypass line; unavoidable outages are planned with the authority and announced to users in advance.
Who reinstates the damaged surface?
It is within our scope. Asphalt or block paving is reinstated to the section defined in the authority's specification.

Let's Plan Your Next Project Together
Share your project scope — our team will assess the site and prepare an item-based proposal.
Request a proposal for your project
Fill in the form and our engineering team will get back to you with an assessment tailored to your scope.