Государственные жилищные программы
Turnkey delivery of mass housing and public building programmes together with their infrastructure.
What we do
Structural and finishing works for housing blocks and public buildings; internal roads, parking, water and sewerage networks, electrical and lighting infrastructure, landscaping and external works.
How we work
Repetition defines mass programmes: the first block is treated as a prototype where details and durations are settled, and subsequent blocks follow that pattern in series. Because infrastructure and buildings advance on one programme, no missing utility connection appears at handover.
Standards
Seismic design follows the applicable code and concrete and reinforcement works follow EN standards; the handover file includes as-built drawings and warranty documents.
Tunnel or system formwork, tower cranes, concrete pumps, precast element supply. On repetitive blocks the formwork cycle is the main programme variable.
Lifting operations and work at height dominate multi-block sites; crane operating envelopes are planned not to overlap. Striking times are tied to concrete strength results.
Предварительная квалификация и обследование
Мы изучаем тендерную документацию, посещаем площадку и документируем текущее состояние и ожидания клиента.
Смета и предложение
Мы предоставляем четко определенное предложение с разбивкой по статьям; исключения явно указаны.
Планирование и разрешения
Устанавливается единый рабочий график, план ресурсов и необходимые процессы получения разрешений.
Производство
Площадка создается, а как инфраструктура, так и надстройка выполняются по единому графику и регулярно отчитываются.
Доставка
Список недостатков закрывается, документы as-built передаются.
Государственные жилищные программы
Construction, maintenance and repair of religious and sports facilities in Mustafakemalpaşa, Karacabey and Mudanya
Construction, maintenance and repair of municipal service buildings, social facilities and village halls
Nilüfer Gümüştepe residential construction
Do you also build the infrastructure?
Yes — that is why the consortium exists. Internal roads, networks and external works run under the same contract as the housing.
Who tracks defects after handover?
The snag list is closed at handover; defects are tracked in writing throughout the warranty period.

Спланируем ваш следующий проект вместе
Расскажите об объёме проекта — команда оценит объект и подготовит постатейное предложение.
Запросите предложение по проекту
Заполните форму, и наша инженерная команда вернётся с оценкой по вашему проекту.